Future Site Plan
Long-Term Site Development
Phase I 2009-2012
1. Roadway and ingress/egress Improvements
2. Septic Improvements
3. Major repair of the Farm House
4. Design and construction of Art/Tech building with maintenance room
5. Design and construction of HS Classrooms and offices (replacing portables)
6. Design and construction of Library /Admin Space (replacing portables)
7. Design and construction of Culinary Art/Commercial Kitchen
8. Improve existing pathways
9. Design and construction of Amphitheater and covered movement space
10. Rehab of existing buildings
11. Energy efficient upgrades to existing buildings
Phase II 2013-2016
1. Design and construction of Gymnasium




